Document Download
Instructions on the procedure of voting at the extraordinary general meeting of shareholders of the OJSC “Uralkali”
(0.02 Mb)
Explanatory Memo on ratification of the new edition of the Regulations on Remuneration and Reimbursement of the Members of the Board of Directors of OJSC “Uralkali”
(0.04 Mb)
Draft regulations on remuneration and reimbursement of the members of the Board of Directors of the OJSC “Uralkali” (new edition)
(0.02 Mb)
Comparative chart of the amendments to the new edition of the regulations on the Board of Directors of OJSC “Uralkali”
(0.01 Mb)
Draft regulations on the board of directors of OJSC “Uralkali” (new edition)
(0.07 Mb)
Comparative chart of the amendments to the new edition of the charter of the OJSC “Uralkali”
(0.01 Mb)
Draft charter of the OJSC “Uralkali” (New edition)
(0.16 Mb)
RAS Statements 3Q 2012
(0.05 Mb)
Ńonsolidated Condensed Interim Financial Information and Review Report for 6 months 2012
(0.45 Mb)
Extract from the minutes no. 270 of the meeting of the Board of Directors of OJSC “Uralkali”
(0.05 Mb)
PLEASE NOTE: The texts of the accounting statements and documents in the English language are a translation prepared for information purposes only. The translation may contain discrepancies and omissions and does not replace the Russian texts of these documents. In any and all cases the texts of these documents in the Russian language shall prevail.




Annual report 2011


Select preferable format:

Uralkali Integrated Report 2012


Select preferable format:

GRI Tables 2012

Uralkali Integrated Report 2013


Select preferable format:

Uralkali Integrated Report 2014


Select preferable format:

Uralkali Integrated Report 2019


Select preferable format:

Uralkali Integrated Report 2019


Select preferable format:

ESG Report 2019


PDF version

ESG Report 2019


PDF version

Uralkali Sustainability Report 2011


Select preferable format:

Cardinal rules

Smoking in mines is prohibited.
Work at heights without wearing a safety harness is prohibited.
Work in electrical installations under voltage is prohibited.
It is forbidden to perform work and stay in the bottomhole zone during the operation of the mining machine.
Loading and unloading operations when people are in the danger zone are prohibited.
Working in underground mines with unsecured and/or unassembled roofing is prohibited.
It is forbidden to carry out repairs and maintenance of conveyors without disconnecting from energy sources, use of conveyors for transfer of people and goods (materials and/or equipment), crossing (either above or under) operating conveyors by employees are not allowed.
It is forbidden to carry out welding and flame work in underground mines and mine buildings without the necessary safety measures preventing fire.