• Eng

Surface Subsidence near Berezniki

25.11.2010
This morning, a soil subsidence occurred under the train tracks of a 6-km bypass railroad spur near Berezniki (Perm Territory) when a freight train was passing through this railroad section. The subsidence resulted in the formation of a crater, currently measuring about 20 by 10 meters. The soil subsidence did not cause any injuries. At present, Berezniki Administration executives and representatives of EMERCOM, Rostekhnadzor, the Sverdlovsk Railways and scientific organizations are studying the situation on the spot.

The subsidence occurred outside of the Uralkali industrial premises. Uralkali used the 6-km train tracks to transport potash from the plant of Mine Group 1 (BKPRU-1), whose annual capacity is about 300 thousand tonnes of potash. The Company's production capacity is 5.5 million tonnes of potash, with about 95% of its products transported using another rail track.

At present, Uralkali is using motor vehicular transportation to deliver the greater part of its products from BKPRU-1 to loading terminals located at the railroad line used by the company. Uralkali does not anticipate any changes in its production plan and continues to explore possibilities for optimizing its production process.

In order to eliminate risks associated with soil subsidence in the area of the 6-km bypass railroad spur, a new 53-km bypass railroad spur was put into operation in 2009, and the main freight traffic of the BereznikiSolikamsk transportation junction was redirected to the new line. As part of its social responsibility efforts, Uralkali participated in the financing of the construction of the 53-kilometer Yaiva-Solikamsk railroad bypass, covering the areas of the Verkhnekamskoye potash-magnesium salts deposit, and allocated 6 billion roubles to the project.
Stock Quotes
Today: 18 October 2019
Investor Calendar
IFRS results announcement for the 1H 2019
29 August 2019

Remind me about events in the calendar with the help of:

Select an application from the list by means of which you would like to be notified about upcoming events.

Customer Services
RSS-feeds update
Subscribe
Annual Report 2018
Uralkali Trading SIA
Electronic Chartering System

Annual report 2011


Select preferable format:

Uralkali Integrated Report 2012


Select preferable format:

GRI Tables 2012

Uralkali Integrated Report 2013


Select preferable format:

Uralkali Integrated Report 2014


Select preferable format:

Uralkali Sustainability Report 2011


Select preferable format: