Uralkaliís Board of Directors Approves an Increase of the Programme to Purchase its Common Shares and Global Depositary Receipts

25.09.2015
Uralkaliís Board of Directors Approves an Increase of the Programme to Purchase its Common Shares and Global Depositary Receipts

Public Joint Stock Company Uralkali announced that its Board of Directors approved today an increase of the size of the previously approved programme to purchase the companyís common shares and Global Depositary Receipts to 704,643,813 common shares, representing 24% of its share capital, for a total purchase price of up to US$2.26 billion

Public Joint Stock Company Uralkali (LSE: URKA; the ďCompanyĒ), one of the worldís largest potash producers, announces that the Board of Directors of the Company, taking into account the level of participation of Uralkaliís shareholders and GDR holders in the repurchase programme, which was approved by the Board of Directors on 24 August 2015 and is being carried out by way of a tender offer by Enterpro Services Limited, an indirect subsidiary of the Company, to purchase common shares and GDRs of the Company (the ďRepurchase ProgrammeĒ), at its meeting today resolved to increase the maximum number of securities to be purchased in the Repurchase Programme to 704,643,813 common shares (in any combination of common shares and GDRs), representing approximately 24% of issued common shares, for a total purchase price to US$2.26 billion.

As of September 24, 2015, holders of Uralkaliís Common Shares and GDRs had tendered 446,181,733 Common Shares and 31,363,901 GDRs, representing in the aggregate approximately 20.54% of issued Common Shares, including 367,001,986 Common Shares, representing 12.5% of the issued Common Shares, tendered by Chengdong Investment Corporation.

In taking its decision the Board of Directors considered, among other things, the recommendation of the Companyís Audit Committee, including the independent non-executive directors, which, having considered the level of shareholdersí participation in the Repurchase Program and the desire to satisfy the demands of all the shareholders who tendered their securities, the advice of its financial advisors and other matters it deemed relevant, at the meeting on 25 September 2015 unanimously recommended to the Board of Directors of the Company that the size of the Repurchase Programme be increased as described above.

The Repurchase Programme will be funded from existing cash balance, external financing obtained and loans from group companies, including the Company.

PJSC Uralkali (www.uralkali.com) is one of the worldís largest potash producers and exporters. The Companyís assets consist of 5 mines and 7 ore-treatment mills situated in the towns of Berezniki and Solikamsk (Perm Region, Russia). Uralkali employs ca. 11,000 people (in the main production unit). Uralkaliís common shares and GDRs are traded on the Moscow Exchange and London Stock Exchange, respectively.

Stock Quotes
Investor Calendar
IFRS results announcement for the FY 2019
5 March 2020

Remind me about events in the calendar with the help of:

Select an application from the list by means of which you would like to be notified about upcoming events.

Customer Services
RSS-feeds update
Subscribe
Annual Report 2019 and ESG Report 2019
Uralkali response to COVID-19
Uralkali Trading SIA

Annual report 2011


Select preferable format:

Uralkali Integrated Report 2012


Select preferable format:

GRI Tables 2012

Uralkali Integrated Report 2013


Select preferable format:

Uralkali Integrated Report 2014


Select preferable format:

Uralkali Integrated Report 2019


Select preferable format:

Uralkali Integrated Report 2019


Select preferable format:

ESG Report 2019


PDF version

ESG Report 2019


PDF version

Uralkali Sustainability Report 2011


Select preferable format:

Cardinal rules

Smoking in mines is prohibited.
Work at heights without wearing a safety harness is prohibited.
Work in electrical installations under voltage is prohibited.
It is forbidden to perform work and stay in the bottomhole zone during the operation of the mining machine.
Loading and unloading operations when people are in the danger zone are prohibited.
Working in underground mines with unsecured and/or unassembled roofing is prohibited.
It is forbidden to carry out repairs and maintenance of conveyors without disconnecting from energy sources, use of conveyors for transfer of people and goods (materials and/or equipment), crossing (either above or under) operating conveyors by employees are not allowed.
It is forbidden to carry out welding and flame work in underground mines and mine buildings without the necessary safety measures preventing fire.