Uralkali Invested RUB 8.5 Million in an Engineering Class

20.09.2022

Today, Secondary School No. 1 of Solikamsk opened an engineering class, in which Uralkali invested RUB 8.5 million. The funds were allocated to purchase modern lab systems for the study of chemistry, physics and computer science. In the future, it is planned to purchase interactive equipment and furniture.

As part of this project, the students enrolled in the engineering class will study physics, mathematics, chemistry and computer science at an advanced level in order to develop their engineering competencies as well as their research and innovation skills.

This initiative will help Uralkali and Perm National Research Polytechnic University to participate in the organisation of specialised pre-university training of school children and to organise career guidance events that will include field trips to the production facilities of the Company.

Irina Konstantinova, Uralkali, Head of HR and Communications, commented:

Uralkali is one of the biggest employers in Solikamsk and Berezniki. The Company is developing rapidly, so we are always interested in attracting qualified staff, especially when it comes to engineering specialisations. The opening of a specialised engineering class in Solikamsk is an important landmark in the development of future professional competencies of school children.




Subscribe
Quick Links

ESG Report 2025

Annual report 2011


Select preferable format:

Uralkali Integrated Report 2012


Select preferable format:

GRI Tables 2012

Uralkali Integrated Report 2013


Select preferable format:

Uralkali Integrated Report 2014


Select preferable format:

Uralkali Integrated Report 2019


Select preferable format:

Uralkali Integrated Report 2020


Uralkali Integrated Report 2021


Uralkali Integrated Report 2023


Uralkali Integrated Report 2024


Uralkali Integrated Report 2025


Uralkali Integrated Report 2019


Select preferable format:

ESG Report 2019


PDF version

Uralkali Integrated Report 2020


Select preferable format:

ESG Report 2020


Select preferable format:

ESG Report 2019


PDF version

ESG Report 2021


PDF version

ESG Report 2022


PDF version

ESG Report 2023


PDF version

ESG Report 2024


PDF version

ESG Report 2025


PDF version

Uralkali Sustainability Report 2011


Select preferable format:

Cardinal rules

Loading and unloading operations when people are in the danger zone are prohibited.
Work at heights without wearing a safety harness is prohibited.
Smoking in mines is prohibited.
It is forbidden to carry out repairs and maintenance of conveyors without disconnecting from energy sources, use of conveyors for transfer of people and goods, crossing (either above or under) operating conveyors by employees are not allowed.
Work in electrical installations under voltage is prohibited.
Working in underground mines with unsecured and/or unassembled roofing is prohibited.
It is forbidden to perform work and stay in the bottomhole zone during the operation of the mining machine.
It is forbidden to carry out welding and flame work in underground mines and mine buildings without the necessary safety measures preventing fire.
No electronic or other devices for the consumption of nicotine-containing products may be carried into or used in the mine.
Согласие на обработку персональных данных